|
Description: This segment of trail will link the
East Bay segment with the Camanche/Pardee Segment.
Trail Segment Coordinator: Megan Rafferty/Sue Shalvey
Planning continues on the Lower Mokelumne River Water Trail project. A
planning group participated inn a day-long exploration of the water
trail route from Camanche Dam to Woodbridge Dam. This included access
points at EBMUD Mokelumne Day Use Area, San Joaquin County Stillman-McGee
Park, City of Lodi Lake, and San Joaquin County Woodbridge Regional
Park. The water trail planning group is meeting with the Delta Trail
project manager and Delta Protection Commission about the scope of the
MCCT/Lower Mokelumne Water Trail and its potential linkage to the
California Delta Trail as proposed by Senator Torlakson. A proposed
bridge would offer linkage between the East Bay Contra Costa Segment and
the Central Valley Segment via the California Delta Trail.
Update: September 20, 2007 |